Stake-N-Shake, Bristol TN - Construction Surveyor
Under contract with US General Construction provided construction surveying services for the construction of a newStake-N-Shake
Restaurant. The project including laying out the building and site features. (2015).

Road Runner BP, Greeneville Tennessee - Project Surveyor
Under contract with Highlands Engineering, provided a Boundary/Topographic Survey for the site design of a Road Runner
Convenience Store/Gas Station. (2015)

AutoZone, Powell, Tennessee - Project Surveyor
Under contract with Civil Engineering Services, provided an ALTA/ACSM Land Title Survey with detailed topography for the site design
of a free standing AutoZone Auto Parts Store. (2015)

Panda Express, Bristol TN - Construction Surveyor
Under contract with Candito Construction provided construction surveying services for the construction of a new Panda Express
Restaurant. The project including laying out the building and site features. (2015).

Panda Express, Kingsport TN - Construction Surveyor
Under contract with Buffalo Construction, provided construction surveying services for the construction of a new Panda Express
Restaurant. The project including laying out the building and site features. (2015).

Dollar Tree, Kingsport TN - Construction Surveyor
Under contract with J.J.O. Construction, provided construction surveying services for the construction of a new Dollar Tree retail store.
The project including laying out the building, site features, and detailed site As-built survey (2015).

2460 Snapps Ferry Road, Greeneville, TN - Project Surveyor
Under contract with Madison Title, provided a ALTA/ACSM Land Title Survey of a 12 acre commercial site, with a 51,000 square foot
warehouse, located in Greeneville, Tennessee.  (2014)

Panda Express, Various Location in Tennessee - Project Surveyor
Under contract with Civil Engineering Services, provided a three ALTA/ACSM Land Title Surveys with detailed topography for the site
design of a free standing Panda Express Restaurants. (2014-2015)

3225 Snapps Ferry Road, Greeneville, TN - Project Surveyor
Under contract with Madison Title, provided a ALTA/ACSM Land Title Survey of three commercial tracts, totaling 11.4 acres, located in
Greeneville, Tennessee.  (2014)

PEPBOYS Auto Center, Chattanooga, TN - Project Surveyor
Under contract with MKAssociates, provided a ALTA/ACSM Land Title Survey of the PepBoys Auto Service Center located on
Gunbarrel Road, Chattanooga, Tennessee.  (2014)

Family Dollar, Bulls Gap, TN - Construction Surveyor
Under contract with Norwood Commercial Contractors., provided construction surveying services for the construction of a new Family
Dollar retail store. The project including laying out building column lines, and site features. (2014)

Halpern Enterprises, Inc, Lenoir, TN - Project Surveyor
Under contract with Halpern Enterprises, provided a ALTA/ACSM Land Title Survey of a 4 acre retail shopping center. The shopping
center had a 32,000 square foot building with six retail stores and restaurants. (2014)

SMR Acquisitions Company, Bulls Gap TN - Project Surveyor

Under contract with Atwater Group, provided a ALTA/ACSM Land Title Survey with detailed topography for the design of a retail
shopping center. The project included the location of underground utilities. (2013)

MAPCO Express, Inc., Knoxville, TN - Project Surveyor
Under contract with Civil Engineering Services, provided a Boundary/Topography Survey for the design and expansion of the existing
service station. The project included the location of underground utilities. (2013)

Mountain Home National Cemetery, Johnson City, TN - Construction Surveyor
Under contract with Frontier Construction Co., provided construction surveying support for the installation of burial crypts at the
veterans cemetery. (2013)

Summer Chase Apartments, Johnson City, TN - Project Surveyor
Under contract with Old Republic Commercial Due Diligence, provided a ALTA/ACSM Land Title Survey of the 96 unit apartment
complex. The project included two FEMA Elevation Certificates. (2013)

Dobyns-Bennett High School, Kingsport, TN - Project Surveyor
Under contract with Clough Harbor & Associates, provided a detailed topographic survey for the design of the reconstruction, and
expansion of the Grand Stands. The project included the location of underground utilities. (2013)

FedEx Ground Facility, Kingsport, TN - Project Surveyor
Under contract with Vortex Engineering & Architecture, provided a Boundary/Topography Survey for the design of the expansion of the
FedEx distribution center. The project included the location of underground utilities. (2012)

McDonald's, Bulls Gap, TN - Construction Surveyor
Under contract with John W. Abbott Construction Co., provided construction surveying services for the renovation of the existing
McDonald's located at Exit 23 on Interstate 81. The project including laying out site features, and providing grades for the construction
of the proposed modifications to the existing site. (2012)

MAHLE, Morristown, TN - Surveyor
Under contract with MAHLE, performed a boundary survey of their corporate headquarters in Morristown, TN. Iron rods were set at 30-
ft intervals along the rear and side property lines for fence installation. Had to meet MAHLE's strict requirements to perform this
project. (2012)

Wendy's State of Franklin Road, Johnson City, TN
Under a contract with Grandbridge Real Estate Capital, prepared a boundary survey of the existing Wendy's Restaurant located on
State of Franklin Road, Johnson City, TN. The survey plat was prepared meeting the 2011 “Minimum Standard Detail Requirements for
ALTA/ACSM Land Title Surveys”. (2012)

Hunter's Crossing Drive Property, Alcoa, TN
Under a contract with Clark, Geer, Latham & Associates, Inc., prepared a boundary/topographic survey of property located on Hunter's
Crossing Drive, Alcoa, TN . The survey plat was prepared meeting the 2011 “Minimum Standard Detail Requirements for ALTA/ACSM
Land Title Surveys” and was utilized for site plan design for a national retail store. (2012)

Netherland Inn Road Roundabout, Kingsport, TN
Under contract with Lyons Construction, provided construction surveying services for the construction of the new roundabout at the
intersection of Netherland Inn Road, Center Street, and Industrial Drive. Responsibilities include site layout of all sub-surface utilities,
centerline alignments, and curb line. Lyons Construction was provided with grade sheets and sketches for all points set (2011)

John Sevier Combined Cycle, Rogersville, TN
Under Contract with URS Corporation, provided monitoring surveying services for settlement of 8 tank foundations at the TVA John
Sevier Combined Cycle Power Plant, located in Rogersville, Tennessee. The purpose of the monthly monitoring was to verify that the
settlement of the tank foundations were even, and at the anticipated design rate.  A report was provided showing the elevations
measured during each trip, and the difference in the elevation measured from the base elevation established at the beginning. (2011)

Energy Solutions, Oak Ridge, TN
Under contract with Falin Enterprises, Inc, provided construction surveying services for the construction of a 1350-ft access road at
the Energy Solutions, Oak Ridge Tennessee site. Falin Enterprises was provided with site benchmarks, centerline road stakes, along
with grade sheets and sketches for all points set. (2010)

Julliard School/Alice Tully Hall, New York, NY
Under Contract with London Fischer, LLP, prepared surveys, reports, and testified as an expert during the arbitration process for a
suit by Turner Construction Company and Lincoln Center Development Project, Inc., to recover construction cost overruns caused by
a surveying error. The case was settled during arbitration. (2007-2010)

Stewart International Airport, Newburgh, NY, Port Authority of New York and New Jersey
While employed by Tectonic Engineering & Surveying Consultants, and under a term agreement with the Port Authority of New York
and New Jersey, was responsible for preparing an ALTA/ACSM Land Title Survey of the 2,400-acre tract encompassing Stewart
International Airport, in the Towns of Newburgh and New Windsor, New York. (2007)

Flushing Town Center, Queens County, New York
While employed by Tectonic Engineering & Surveying Consultants, and under contract with Urbitran Engineering, responsible for the
review and oversight of the monitoring survey of an elevated MTA subway and Vehicle Bridge and additional retaining walls within
close proximity of a 32-acre construction site. The purpose of the monitoring survey was to determine if any of the structures were
moving or settling during pile driving at the construction site. This project required the setup of a permanent robotic total station,
computer with GeoMos program, and Internet connection to remotely monitor 29 prisms placed on the steel structures and concrete
retaining walls. Continuous automated monitoring was completed for 6 weeks prior to construction to generate a baseline for
comparison, to establish any movement. Unmanned automated monitoring was recorded and processed each day and a report was
automatically created and sent daily over the Internet to our office location 50 miles from the site. See “
Unmanned and Secure” article
in Professional Surveyor Magazine, October 2007. (2006-2007)

Lower Manhattan Rehabilitation, New York, NY
While employed by Tectonic Engineering & Surveying Consultants, and under a term agreement with the New York City Department of
Design and Construction, I was responsible for overseeing the field survey, calculations, and mapping of over 8.3 miles of streets in
lower Manhattan. The mapping for this project had to meet the strict standards of the New York City Department of Transportation.
This project involved the establishment, location, and mapping of all right-of-way lines, property lines, surface features, and
subsurface features including utilities with spot elevations and capacities. The mapping required the preparation of profiles of the
street centerline, curb-lines, back of sidewalk and of the subsurface storm and sewer lines.  The purpose of the mapping is for the
design of the reconstruction of the street and infrastructure. (2002-2005)

FEMA Flood Studies, Northern New Jersey
While employed by Tectonic Engineering & Surveying Consultants, responsible for the quality control of the surveying and mapping
activities related to providing cross sections of the river bottoms and hydraulic structures of portions of 9 rivers in 3 major drainage
systems throughout northern New Jersey. Data was provided to Natural and Technical Hazards Management Consultants, Inc and AVF
Design, Inc., to re-assess flood plain elevations and locations for the FEMA’s Map Modernization Program. (2004-2005)

Astoria Tunnel Project, Cimarron Engineering. Astoria, Queens, NY
While employed by Tectonic Engineering & Surveying Consultants, and under a contract with Cimarron Engineering, I was responsible
for all Surveying and Mapping services for the design and construction of a 36-inch gas main through the Astoria Tunnel, running 200-
ft below the East River, between the Boroughs of Queens and Manhattan. The project was completed for Consolidated Edison
Company of New York. Cimarron Engineering was provided with baseline control points, detailed 3-dimensional mapping, and cross
sections of the two vertical shafts at either end of the tunnel and of the tunnel itself. Mapping was also prepared of all the apparatus
inside the head houses and all the utilities within 200-ft of the head houses on both ends of the tunnel.
The Astoria Tunnel project
was the recipient of the New York ACEC Diamond Award for Engineering Excellence in the Surveying and Mapping
category
. (2004)

World Trade Center Disaster Recovery Effort, Borough of Manhattan
While employed by Tectonic Engineering & Surveying Consultants, and under a term agreement with the New York City Department of
Design and Construction, I was responsible for overseeing the survey crews at the World Trade Center Disaster Site.  Survey crews
were utilized for the monitoring of standing and hanging debris, building remains slurry wall, crane pads and other various structures
for settlement and movement helping assure the safety of people on the site. I also assisted with setting control points and layout of
site features to help expedite the rescue effort. “
Safety in the Trenches” article in POB Magazine, January 2003. (September 2001
through February 2002)

                                                                       "Professional Land Surveying Services"
M. Lacey Land Surveying
Professional Land Surveying Services
Bulls Gap, TN 37711
Phone: 423-235-5546